Skip to the content.

4. The readiness rubric

This chapter is the standard. When StackNative’s consultant tells someone their process is Early, Ready, or Advanced, it means exactly what is written here and nothing else. The verdict is a score, not an impression, and the person receiving it is entitled to see the arithmetic.

Six dimensions, scored 0, 1, or 2. Twelve points available.

1. Decision clarity

Can someone write down what a good outcome looks like, precisely enough that two experienced people would agree on most cases?

This is the dimension that most often forces an Early verdict, and the one clients most often score themselves too high on. A useful probe: ask for ten past cases and the reasoning. If the reasoning is reconstructed rather than recalled, score 0 or 1.

2. Data accessibility

Can a program reach the information the process needs, without a person fetching it?

Score 0 only when nobody has succeeded in getting the data out. Slow access is a 1; impossible access is a 0.

3. Volume and repetition

Does it happen often enough that redesign pays back?

Volume is not only about payback. Low volume also starves you of the examples you need to tell whether the redesign is working.

4. Error tolerance and reversibility

What happens when the process gets one wrong?

Score the typical error, not the worst imaginable one. If most errors are cheap and a minority are irreversible, score 1 and name the minority: that is where a checkpoint goes. Score 0 only when the ordinary error is the expensive kind.

A 0 here does not disqualify a process. It relocates the design toward approval checkpoints and raises the cost of the pilot. Be explicit about that trade rather than hiding it in a score.

5. Existing structure

Does the process have identifiable steps and review points, or is it one undifferentiated act of judgment?

6. Ownership

Is there one person who can approve changing how this works?

Score this honestly even though it feels political. It is the single best predictor of whether the work finishes, and it is the dimension that no amount of good technology compensates for.

The bands

Total Band What it means
0–5 Early Do not redesign this process yet. The preconditions are missing, and building agents on top of them produces an expensive system that nobody trusts. Fix the lowest-scoring dimension first; usually it is decision clarity or data access.
6–9 Ready Redesign this process now, on its own, with checkpoints placed by Chapter 3. This is the band where a pilot pays back inside a quarter.
10–12 Advanced The preconditions are strong and something is probably already partly automated. The work here is depth and scale: instrumentation, cost control, removing the remaining human steps that exist out of habit rather than consequence.

Rules for scoring

Score what is true today, not what is planned. A data integration on next quarter’s roadmap scores 0. Roadmaps slip and rubrics that price in optimism stop discriminating.

When genuinely torn between two scores, take the lower one. Being told you are Early and proving it wrong in six weeks costs a client nothing. Being told you are Ready and failing costs them a quarter and their appetite for trying again.

A single 0 on dimension 1 or 6 caps the verdict at Early, regardless of total. You cannot automate a decision nobody can state, and you cannot ship a change nobody can approve. These two are preconditions rather than contributions, and the arithmetic must reflect that.

Take stated facts at face value. If the owner states something that maps to an anchor, score the anchor. Discount a stated fact only when something else they said contradicts it, and say which.

Show the scores. Every read-out names the six numbers and the total. A verdict a client cannot audit is an opinion wearing a uniform.